About
Length0.5 mi
ShapeLoop
DifficultyEasy
Elevation gain20 ft up
Typical time15 min
TrailheadDevastated Area, park highway
SurfacePaved loop, wheelchair accessible
Best seasonJuly to October. The park highway crosses 8,500 feet and is usually buried in snow from November until late June.
DogsNot allowed
What you'll see 🌄 Big views🌼 Wildflowers

A paved accessible loop through the ground the 1915 eruption blew flat.

Tips
Fully wheelchair accessible. The boulders scattered here were thrown by the blast, and the forest is still visibly recovering more than a century later.
Location

Devastated Area, park highway

Other Hikers
No one has logged this trail yet.
Your Hikes

🔒 Login or create an account to record the trails you've done, rate them, and tie them to a trip.